12bet mobile app

About Jun Geer Banner Kim Jongtai Coal Co., Ltd. Market -based Coal Transportation Announcement (Zhuozi、Tuyou Power Plant)
Source:    Author:    Time: 2022-02-28 15:40    Browse: 3515 times

League of Gegel Banner Kim Jongtai Coal Co., Ltd. Coal Transport Bidding for Coal Transportation:

1. Comprehensive description:

1, transport transaction

2、Bading unit: Jun Ge Bana Ningzhengtai Coal Co., Ltd.

3. Bading method: Online public bidding (website:/

4. During the bidding period: 2022.02.28 15: 45-2022.02.28 16:00

2. Bidding content and instructions:

1. Implementing transaction margin and performance deposit system

(1) is to maintain the legitimate rights and interests of both parties in the transaction,The commissioner and the dealers participating in the bidding transaction (hereinafter referred to as the "carrier") must pay 100,000.0 yuan/field,Entrying money needs to be accountable for public households,Do not accept personal and cash accounts。

(2) The carrier must be in the deadline for registration (2022.02.28 14:00) Pre -,Payment of 100,000.0 yuan/field,Enterprises that have not paid the deposit in full time within the time limit will not be able to participate in bidding transactions。

(3) Coaling trading of coal product highway,Same ore spots and varieties of commodity coal,The commissioner and the carrier 12bet online betting websitehave signed a transportation contract,The overlapping period of the contract execution period and this transportation period In principle, the carrier shall not participate in the commodity coal logistics transportation for the first bid。If the previous order before the inheritance party has been fulfilled,Requires to participate in the bid for the next time,Must end the original contract,After the two parties signed a supplementary agreement,Fang can participate。

Margin account information:

account opening unit: Ordos Coal Network Co., Ltd.

Account Name: China Construction Bank Co., Ltd. Ordos Civilization Road Sub -branch

Account account number: 15050110223100000003

Fund use: e -commerce platform margin

margin, please at 2022.02.28 14: 00 to the account,If the non -performance deposit,It will be deemed to be automatically given up。

(4) After the bidding transaction is successful,The transaction margin paid by the carrier automatically switched to a performance deposit,To ensure the normal performance of the transaction contract

(5) After the bidding transaction is successful,The carrier signed a transport contract within one working day。If the carrier does not sign the contract within the prescribed time, it will be deemed to be default,Deduct all its margin。

(6) Unsus users "Ordos Coal Network" will refund the deposit within 3 working days。

(7) Users participating in the bidding must strictly abide by the transaction measures of this transaction platform、12bet online bettingTrading process and transaction system,and strictly in accordance with the deposit management measures on this transaction platform to handle the deposit procedures and refund procedures。This transaction platform does not pay any interest on 12bet mobile appthe deposit submitted by the bidders。

2. Basic information of trading products:

12bet casino


Remarks: (1) A total of 600,000 tons of supply this time,The specific allocation of the Zhuangzi Power Plant and the Tulia Power Plant shall be determined by Inner Mongolia Huadian Fuel Co., Ltd.。

(2) This offer is a quotation,The bidding price is tax -containing price (9%tax) This price is the benchmark price,In the case of market changes, the supplementary agreement of coal mines and power plants shall prevail。。

(3) All users participating in this bid,You need to sign the platform bidding agreement with this platform in advanceAll new users participating in this bid,You need to register in advance to submit the trial qualification,Qualification review can only participate in bidding,(The transportation company involved in the bidding must have the qualifications of the transportation industry)。

(4) The cost of unloading is borne by the carrier,The carrier should investigate the site by themselves before bidding,and include the unloading cost in the total bid price。

(5) The platform transaction fees that occurred this procure。Platform transaction fee charging standards shall be implemented in accordance with its regulations。

(6) Unloading time: The carrier is surveyed by the carrier and organized transportation in accordance with the actual requirements of the power plant,The cost is included in the total bid price。:

3, settlement method: offline settlement

4、Contract period: February 21, 2022 -December 20, 2022

3、The responsibility and obligation of the consignment party and the carrier after the contract is generated:

1、Winning the bidding forces during the transportation period of coal,The unified management of the designated unit or the designated unit should be obeyed。within the range of the shipping party,Vehicles must meet environmental requirements,Put a pocket cloth under the cooling fan、The renovation of the exhaust cylinder cannot blow directly to the ground,The vehicle must be covered in front of the door of the vehicle to transport the tunnel。

2、Winning the bidding forces effective organizational vehicle,Passing the coal from the cargo loaded the car to the place of the cargo to complete the unloading。

3、If the non -resistant situation is caused by natural disasters, the winning party cannot complete the transportation according to the requirements of the shipping party,Winning of the bidder should notify the consignment party。

4、All transport vehicles in the winner of the bidder must be according to the requirements of the shipping party,Installation of the vehicle positioning 12bet online betting websiteequipment that meets the requirements of the shipping party,and debug the logistics platform specified by the shipping party for debugging,The related service fee generated by this is borne by the winner of the bid for the transportation。

5、The winner of the winner of the bidding must bear the shipping place of goods、Related miscellaneous fees when the goods arrive at the land。

6、Freight in the cargo、The cargo arrives at the land bidding party to arrange enough personnel to do a good job of invoicing、Maintenance of vehicle order、Coal safety inspection、Seal Signage Examination、Power plant pick -up、Pound single collection statistics review and other on -site management work。

7、All responsibilities during the carrier、Business risk、Safety risks and expenses are all borne by the winner of the bid for the transporter。

4. Note:

1、Online bidding method: This bidding adopts the number and price of the supply and transportation online with Internet technology,Login system with the registered username and password to participate in the bidding。

2、Inquiry results and contract signing: View the transaction announcement with the registered user name and password,The bidding successful unit signs the coal transportation contract with the order formed by the Ordos Coal Network and the Jindegel Banner Coal Co., Ltd.。

3、The dealers who have obtained a trading qualification through the bidding procedure of this transaction platform 12bet casinodefault,It will not be refunded in accordance with the management measures of the margin of this transaction platform.,The bidding target will be processed separately by this transaction platform。Member dealers with breach of contract will be included in the blacklist on this trading platform,Its trading qualifications and online shops will be suspended,It is forbidden to participate in trading activities on this platform,Please rational bids。

4、For example, if this trading platform uses technical means to master individual traders in the process of bidding, there is a "participant malicious stringing、Actions of Human Control Transaction Price,Then this transaction platform has the right to immediately suspend bidding or cancel the bid。

5、If a hacker attack、System failure、Server failure and other reasons,Caused the bidding interruption or cannot be carried out normally,The bidding procedure in this field is invalid,And this transaction platform has the right to deal with the full bidding of the game,No dealer has no right to interfere。

6、Users participating in the bidding must strictly abide by the transaction measures of this transaction platform、12bet online bettingTrading process and transaction system,and strictly in accordance with the deposit management measures on this transaction platform to handle the deposit procedures and refund procedures。This transaction platform does not pay any interest on 12bet mobile appthe deposit submitted by the bidders。

4. Others:

The bidding interpretation right is owned by Ordos Coal Network.

 

League Geer Banner Kim Jongtai Coal Co., Ltd.

2022-02-28


Coal delivery e -commerce Coal big data Ordos Coal